• Project

    Media City Tower 3

  • Location

    Salford

  • Client

    Vermont Construction

  • Description

    Dual-utility solution

    • 1.5MVA substation
    • 6.6kV cables to be laid from the point of connection
    • Seven 300mm2 LV cables, 15m of HV earth cable and 170mm copper earth cable installed between the substation and ground floor plantroom
    • Coordination with water supply provider
    • 1MVA connection with a HV metered temporary builders’ supply