Waitrose Distribution Centre

Matrix Park, Chorley

  • Excavation and installation of:
    – 200m of twin circuit 300mm HV triplex cable to ENW specification
    – 200m of Gas Main up to Gas Governor Rig
  • Installation of 2.0MVA HV Metered Substation, including associated HV cabling, and earthing